Best Practice

LOCATION: Asphalt/Coating plant ARTICLE YEAR 2021
ACTIVITY: Transport & Logistics / Delivery COMPANY: Aggregate Industries
SUB ACTIVITY: Loading COMPANY LOCATION: Bardon Hill Laboratory
BEST PRACTICE No: BP2092 COMPANY TEL: 0000
COUNTRY OF ORIGIN:
TITLE  
Quality inspections – wagon isolation
ARTICLE

Entry  21154                     Finalist                      Fatal 1 and 2

Aggregate Industries Bardon Hill quarry produces over a million tonnes of asphalt per day. Between 50 to 60 trucks leave the site each day, the temperature of the asphalt load is checked by a technician using a heat probe. Prior to taking the heat measurement, the technician made contact with the driver positioned by the gantry and either asked him for his keys or indicated that he needed permission from the technician before moving on. There had been a number of incidents where the driver had moved on without permission exposing the technician to potential injury.

Following a risk assessment of the activity, it was decided to put in place a safe system of work for temperature measurement and sampling of asphalt and/or aggregates from delivery vehicles.

Please click here for more information or on additional information

ARTICLE IMAGES
Click image to enlarge

Click image to enlarge

https://www.youtube.com/watch?v=c1SuLit4sP8&list=PLXu4cRX3643eLLjzIPiuSop3CJxGT-xHf&index=22
Request Futher Information
pdf document availableadditional pdf document
Go back to search critera